Qwest Field

Photo Credit: Turner Construction
  1. Photo Credit: Turner Construction
  2. Photo Credit: Turner Construction

Photo Credit: Turner Construction

Over a five-year period, McKinstry designed, budgeted, studied, compared, investigated and constructed this state-of-the-art stadium featuring 72,000 seats, 118 suites, 10,000 Premium Club seats, two Club Lounges that stretch almost the entire length of the football field, a Club Restaurant/Bar, 46 food concession stands, 2 cutting edge scoreboards, 400 television monitors, and an underground turf heating system for optimum year round growing conditions.

This was the first mechanical design-build stadium in the nation. Delivering the pre-fab materials and equipment on time and when needed was key to a successful installation.

Project Partners:        
Owner - First & Goal/Vulcan NW
Developer - Vulcan NW
Architect - Ellerbe Becket
General Contractor – Turner Construction 

Sports & Entertainment, Energy, Construction, Consulting, Washington