Overlake Hospital
When an ornamental main entrance was designed for Overlake Hospital, McKinstry’s Architectural Metals team was assigned with fabricating and installing the elements.
The main entrance combined metal siding and custom formed aluminum cladding fabricated in McKinstry Roberge’s Seattle facility. Critical detail was achieved by the ability to manufacture on a short lead time from field verified dimensions. The result was a unique architectural metals application – installed on schedule and within budget.
Project Partners:
Architect – ZGF Architects
General Contractor – GLY Construction



