|
This project consists of a design build shell HVAC, plumbing and fire protection for 329,000 square feet
in six buildings. This is a fast track project with simultaneous construction on all buildings. There are two rooftop
DX VAV AC units for each building and underslab drainage in two buildings.
Innovative method of supporting equipment screening off the rooftop AC units on two
3-story buildings. |