McKinstry installed the ventilation and exhaust systems for this facility along with an air conditioning system for designated areas. The mechanical system for this project was coordinated with tight structural requirements, utilizing exposed ductwork installed through open web joists.
Two and a half months was deleted from the original seven month schedule. Acoustical treatment was added to the physical therapy office. |