Sound,
Mind & Body > Seattle, WA McKinstry installed the ventilation and exhaust systems for this facility along with an air conditioning system for designated areas.
St.
Elizabeth Surgery Addition & Remodel > Baker City, OR McKinstry provided complete piping, sheet metal, plumbing and fire protection services for this fast-track project, which consisted of two new operating rooms, one mechanical room and a remodel of the pre-operation sterilization facility.
YMCA -
Downtown >
Seattle, WA This project was a complete remodel of a historic 9-story
high-rise building located downtown on 4th & Marion. There
were extremely tight design constraints due to untouchable
historical building components.