This fast track design and construction project involved working on a 30,000 square foot gaming arcade. The job included the installation of ten each 6,500 cfm fan coil units with chilled water and hot water coils, 100% OSA dampers and VFD’s on all of the units, as well as a 170 ton air cooled chiller and grease exhaust systems. All duct work and piping was installed exposed. Plumbing on the job included toilet rooms, kitchens, brew pub and brewery. 

Sega Gameworks
Seattle, WA

 