Bellevue
Art Museum > Bellevue, WA The building is three stories tall and has many types of rooms including: gallery space,
auditorium, classrooms, artist in action rooms and offices.
Experience
Music Project > Seattle, WA The Experience Music Project has a 140,000 square foot interactive museum with 1,000 tons of chilled water
and site steam line from the Seattle Center to the museum.
Muckleshoot
Casino > Auburn, WA This project was a design build, fast track expansion of the existing facility, which doubled the
size of the casino.
Oregon
Convention Center > Portland, OR A 500,000 square foot convention facility covering nine square blocks featuring 150,000 square feet of exhibit hall, four 25,000 square foot ballrooms, 28
meeting and conference rooms, and the
largest food preparation kitchen in Oregon capable of serving 5,000 people.
Seahawk
Stadium >
Seattle, WA This was the first mechanical design build stadium in the nation. Delivering the
pre-fab, materials and equipment on time and when needed was key to a successful installation.
Seattle
Exhibition Center/Stadium > Seattle, WA This 320,000 square foot exhibition center and 500,000 square
foot parking garage holds 1,200 tons of cooling by roof top packaged units and had 246 plumbing fixtures installed.
Sega
Gameworks > Seattle, WA This fast track design and construction project involved working on a 30,000 square foot gaming
arcade.
The Paramount
Theatre >
Seattle, WA McKinstry self-performed the complete design and mechanical scope of work for
the renovation/remodel of this 3,000 seat theater, while keeping the architectural integrity of this historical 1928 building intact.