Epoch
Biosciences > Bothell, WA This design build project was to provide 10,000 square feet of laboratory and
15,000 square feet of office space in the Nexus Building.
Lake
Union I LLC Rosen Remodel >
Seattle, WA This project was a remodel of an existing laboratory in order to
add a BL-3 facility as well as several additional labs. The BL-3 suites are very sensitive research labs with critical requirements for pressurization control and exhaust filtration.
University of
Washington Rosen Building > Seattle, WA Approximately 2,000 hours of prefabricated piping/pumping skids, etc. were pre-planned to minimize the “on-site” labor. This planning enabled the fast track schedule to be met.
ZymoGenetics
- Davie Building > Seattle, WA The lab piping was installed for this project under strict cleanliness standards. Clean steam piping was installed observing strict cleanliness, welding procedures and inspections.